
[Jun-2026] C_P2W22_2504 PDF Dumps Extremely Quick Way Of Preparation
Download C_P2W22_2504 Dumps (2026) - Free PDF Exam Demo
NEW QUESTION # 49
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A. Assign the alert profile to the overall profile
- B. Create an object selection variant for production-planning-related alerts
- C. Create an object selection variant for alerts according to the priority of ATP categories
- D. Assign the overall profile to the authorization profile
Answer: A,B
NEW QUESTION # 50
When do you use variant bills of material (BOMs)?
- A. When a material has a configurable BOM
- B. When multiple materials have similar BOMS
- C. When a material has multiple BOMs
- D. When multiple materials have multiple BOMS
Answer: B
NEW QUESTION # 51
When does the system trigger replenishment for a Kanban container?
- A. When you set the container to Full
- B. When you set the container to Waiting
- C. When you set the container to Empty
- D. When you set the container to In transit
Answer: C
NEW QUESTION # 52
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.
- A. Total replenishment lead time
- B. Setup time
- C. Float after production
- D. Opening period
Answer: B,C
NEW QUESTION # 53
Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?
- A. Integrated Business Planning
- B. Advanced Planning
- C. Flexible Planning
- D. Standard Sales and Operations Planning
Answer: A
NEW QUESTION # 54
Which of the following are replenishment strategies for Kanban containers?
Note: There are 2 correct answers to this question.
- A. Replenishment using direct transfer posting
- B. Replenishment using reservations
- C. Replenishment using process orders
- D. Replenishment using planned independent requirements
Answer: A,B
NEW QUESTION # 55
What can you use standard heuristics in Advanced Planning (PP/DS) for?
- A. To set default values in production master data
- B. To optimize costs and times in production plans
- C. To solve planning problems for defined objects
- D. To automate material movements in material staging
Answer: C
NEW QUESTION # 56
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
- A. ATP quantities
- B. Production orders
- C. Planned orders (firmed)
- D. Planned orders (unfirmed)
Answer: B,C
NEW QUESTION # 57
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.
- A. Changing a storage bin
- B. Changing a delivery address
- C. Changing a dependent requirement
- D. Changing an operation time
Answer: C,D
NEW QUESTION # 58
What is a work center hierarchy?
- A. A group of work centers in a production line that is used in sequence for production
- B. A group of alternative work centers providing a cumulative available capacity for production
- C. A group of alternative work centers for production, structured in hierarchy levels by priorities
- D. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
Answer: B
NEW QUESTION # 59
How do you model a production line in repetitive manufacturing?
- A. As a work center
- B. As a resource network
- C. As an operation
- D. As a routing
Answer: A
NEW QUESTION # 60
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
- A. MRP creates a planned order.
- B. A sales order is delivered.
- C. A sales order is created.
- D. MRP creates a dependent requirement.
Answer: C
NEW QUESTION # 61
In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?
- A. The operation is rescheduled to an alternative work center.
- B. The operation CANNOT be dispatched.
- C. The operation is rescheduled in the planning direction.
- D. The operation is rescheduled backwards.
Answer: C
NEW QUESTION # 62
Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.
- A. Customers can use the dashboard in the dev, test, and production tenants.
- B. It can be accessed by using SAP For Me.
- C. It can be used in all SAP S/4HANA Cloud editions.
- D. Customers can grant access to the dashboard to partners.
Answer: B,D
NEW QUESTION # 63
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
- B. Net requirements calculation is carried out for every sales order individually.
- C. Storage location MRP areas are required to manage sales-order-specific stock.
- D. Production and procurement costs are managed on the sales order item level.
- E. Planned orders are created in MRP with reference to sales orders.
Answer: B,D,E
NEW QUESTION # 64
When can you maintain the batch characteristic values in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. When you post the goods receipt
- B. When you record inspection results
- C. When you execute batch determination
- D. When you release the batch
Answer: A,B
NEW QUESTION # 65
Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. Use the material number for selection
- B. Use a propagation range
- C. Use a different MRP planner for PP/DS materials
- D. Use the special MRP type XO
Answer: C,D
NEW QUESTION # 66
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Work center
- B. Bill of material
- C. Routings
- D. Production order
Answer: B,C
NEW QUESTION # 67
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
- B. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
- C. The consistency check must be performed.
- D. The assigned routing and bill of material (BOM) must have the same validity period.
- E. The lot size range must be within the lot size range of the assigned routing.
Answer: B,C,E
NEW QUESTION # 68
What are the selection criteria of a bill of material (BOM) alternative?
Note: There are 2 correct answers to this question.
- A. Change number
- B. Date
- C. Lot size
- D. Material BOM usage
Answer: B,C
NEW QUESTION # 69
How do you assign resources in a master recipe with operations and phases?
- A. You assign resources to the sub-operations.
- B. You assign resources to the operations.
- C. You assign resources to the header of the master recipe.
- D. You assign resources to the phases.
Answer: B
NEW QUESTION # 70
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative offset time
- B. Specify a negative planning horizon
- C. Specify a negative opening period
- D. Specify a negative PP/DS horizon
Answer: A
NEW QUESTION # 71
In which master data objects do you maintain data to determine the duration of an operation for production?
Note: There are 2 correct answers to this question.
- A. Production version
- B. Routing
- C. Work center
- D. Material master
Answer: B,C
NEW QUESTION # 72
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?
- A. Process order management
- B. Batch management
- C. Quality management
- D. Engineering change management
Answer: B
NEW QUESTION # 73
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
- A. Operations on multi-resources are planned finitely in a sequence.
- B. An operation is scheduled as close as possible to the desired date.
- C. Sequencing on multi-activity resources is automatically updated during planning.
- D. To create a slot, neighbouring operations are moved in both planning directions.
Answer: B
NEW QUESTION # 74
......
Enhance your career with C_P2W22_2504 PDF Dumps - True SAP Exam Questions: https://www.verifieddumps.com/C_P2W22_2504-valid-exam-braindumps.html
