Free SAP C_TS422_2020 Test Practice Test Questions Exam Dumps [Q22-Q43]

Share

Free SAP C_TS422_2020 Test Practice Test Questions Exam Dumps

Prepare Top SAP C_TS422_2020 Exam Audio Study Guide Practice Questions Edition


SAP C_TS422_2020 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Outline both motivation and background of SAP S/4HANA
  • Detailed scheduling planning board) and advanced planning
Topic 2
  • Explain and compare the different production methods in make-to-order
  • Determine BOM item category, describe order status management and set user statuses
Topic 3
  • Introduction to SAP S/4HANA Supply Chain Planning
  • Identify features for Good Manufacturing Practices (GMP)
Topic 4
  • Material Requirements Planning in SAP S/4HANA
  • Describe its main components, the lines of business, and the SAP User Experience strategy
Topic 5
  • Select and apply planning strategies, use the planning table, characterize long-term planning
  • Determine master data objects for process orders
Topic 6
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Explain line load planning and confirmation, outline Kanban master data and Kanban processes
Topic 7
  • Outline production planning components and functions, differentiate consumption-based planning vs. MRP
  • Identify repetitive manufacturing specific master data
Topic 8
  • Characterize process order elements and process order processing
  • Outline the basics and master data of advanced planning
Topic 9
  • Identify and explain production relevant master data
  • Outline best practices for using SAP S/4HANA

 

NEW QUESTION 22
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.

  • A. Checking control must have an overall profile assigned in customizing.
  • B. Checking rule and group must be assigned.
  • C. Indicator Relevant for finite scheduling must be set.
  • D. PRT Availability check must be set.

Answer: A,C

 

NEW QUESTION 23
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

  • A. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
  • B. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  • C. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  • D. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.

Answer: D

 

NEW QUESTION 24
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.

  • A. SAP Concur
  • B. SAP Ariba
  • C. SAP Field glass
  • D. SAP C/4HANA
  • E. SAP SuccessFactors

Answer: A,B,C

 

NEW QUESTION 25
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple production versions are maintained for one product
  • B. When multiple planned orders exists in one resource
  • C. When multiple operations are maintained for one product
  • D. When alternate resourcesare used within one operation

Answer: D

 

NEW QUESTION 26
What determines whether the planned independent requirements in MRP consume other requirements?

  • A. Requirements profile
  • B. Order type
  • C. Consumption sequence procedure
  • D. Requirements type

Answer: D

 

NEW QUESTION 27
What is the purpose of collective orders?

  • A. To post any component withdrawals single back flush with order confirmation
  • B. To manage production orders for an entirefinished product on multiple levels
  • C. To post production costs ona cost collector instead of the production order
  • D. To combine order management of co-products and by-products with the main product

Answer: B

 

NEW QUESTION 28
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Find Slot
  • B. Scheduling working time only
  • C. Squeezing
  • D. Insert operation

Answer: A

 

NEW QUESTION 29
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.

  • A. Engineering change management
  • B. Planning
  • C. Implementation
  • D. Inspection during production

Answer: B,C

 

NEW QUESTION 30
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements only if the work center has sufficient capacity.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • D. MRP creates capacity requirements without checking the capacity of a work center.

Answer: D

 

NEW QUESTION 31
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Functional Location BOM
  • B. Work Center BOM
  • C. Sales Order BOM
  • D. Class BOM

Answer: A,C

 

NEW QUESTION 32
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?

  • A. Kanban
  • B. Production order release
  • C. Material requirements planning
  • D. Back flushing

Answer: C

 

NEW QUESTION 33
What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

  • A. Scheduling agreement schedule line
  • B. Purchase requisition
  • C. Stock transport order
  • D. Planned order
  • E. Production order

Answer: A,B,D

 

NEW QUESTION 34
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. To determine the work in progress along the production line
  • B. To reduce the totalproduction lead time for along production line
  • C. To stage different components for a production line simultaneously
  • D. To provide timely updates of inventory management for the staged components

Answer: A,D

 

NEW QUESTION 35
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Order (pool) chart
  • C. Orders (dispatched) chart
  • D. Capacity requirements chart

Answer: A,D

 

NEW QUESTION 36
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Material staging for next order in sequence
  • B. Posting of goods receipt for the product
  • C. Posting of production costs to the production cost collector
  • D. Archiving of documents for assembly scrap
  • E. Reduction of associated capacity requirements

Answer: B,C,E

 

NEW QUESTION 37
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.

  • A. Individualconversion
  • B. Full conversion
  • C. Partial conversion
  • D. Order release

Answer: B,C

 

NEW QUESTION 38
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a transportation resource in the location master.
  • B. Model a handling resource in the location master and goods receipt time in the mater all master.
  • C. Model a separate resource inthe production data structure.
  • D. Model a resource inbound in the location master.

Answer: A,B

 

NEW QUESTION 39
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Production orders are created with sales order reference.
  • B. Sales order-specific stock is created
  • C. Sales order-specific planning run is required.
  • D. Storage location MRP areas are required.
  • E. Net requirements calculation is sales order-specific.

Answer: A,B,E

 

NEW QUESTION 40
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.

  • A. It is used by product costing to determine how costs are rolled up.
  • B. It is used in MRP to determine the sequence in which materials are planned.
  • C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
  • D. It is used by ATP to determine the priority of alternative components.

Answer: A,B

 

NEW QUESTION 41
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers tothis question.

  • A. Predefined GMP compliant process order types to meet audit requirements
  • B. Documentation of quality data with Quality Management
  • C. Recipe approval (with Engineering Change Management)
  • D. Use of the digital signature function to check and run business processes
  • E. Use of the GMP compliant flag in relevant master data applications

Answer: B,C,D

 

NEW QUESTION 42
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a positive offset time in the strategy profile.
  • B. Specify a negative offset time in the strategy profile.
  • C. Specify a positive planning horizon in the strategy profile.
  • D. Specify a negative planning horizon in the strategy profile.

Answer: B

 

NEW QUESTION 43
......