[Jan 07, 2022] Prepare For The HPE0-S54 Question Papers In Advance
HPE0-S54 PDF Dumps Real 2022 Recently Updated Questions
HP HPE0-S54 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
| Topic 10 |
|
| Topic 11 |
|
| Topic 12 |
|
| Topic 13 |
|
| Topic 14 |
|
| Topic 15 |
|
| Topic 16 |
|
| Topic 17 |
|
| Topic 18 |
|
| Topic 19 |
|
NEW QUESTION 61
You prepared a proposal for a customer that plans to deploy Hyper-V clusters that include network adapters with RoCE support. The customer would like to know why this specific adapter was included in the proposal.
How would you explain your choice?
- A. RoCE adapters are the only adapters certified to use in Hyper-V based cluster
- B. RoCE adapters can use 100 Gb/s speed for internal virtual machine migrations
- C. RoCE adapters will improve performance for live migration and Microsoft SMB Direct environments
- D. RoCE adapters offer Secure Encryption functionality that can help to secure migration traffic
Answer: C
NEW QUESTION 62
Match each HPE technology solution to the customer's business need that it can fulfill.
Answer:
Explanation:

NEW QUESTION 63
A customer wants to evaluate the new feature in iLO5 that provides the ability to permanently erase all data on a server.
What iLO5 license will the customer require for this proof of concept (PoC)?
- A. iLO Advanced
- B. iLO Standard
- C. iLO Advanced Premium Security
- D. iLO Standard BladeSystem Edition
Answer: C
NEW QUESTION 64
You have a customer who has thousands of ProLiant servers spanning Gen8, Gen9, and Gen10 across multiple server models (Rack, Tower, Blade, Apollo), all licensed with iLO Advanced. The customer needs an effective way to inventory and update the firmware across the environment.
Which tool should you recommend?
- A. OneView
- B. SUM (System Update Manager)
- C. iLO Amplifier Pack
- D. Intelligent Provisioning
Answer: C
NEW QUESTION 65
A customer needs a Synergy solution using Image Streamer in a production environment.
What is the minimum number of Synergy frames needed for this solution?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
Explanation:
Explanation/Reference: https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815217.pdf
NEW QUESTION 66
A customer is considering deploying a significant number of HPE BladeSystem Gen10 servers with an HPE
3Par storage solution for a new cloud solution. You propose HPE OneView as the management platform.
Which HPE OneView feature should you emphasize during conversations with the customer?
- A. servers and storage firmware upgrades
- B. volume presentation from the 3Par and automated zoning
- C. operating system deployment through Image Streamer
- D. patch deployment for operating system and storage components
Answer: B
NEW QUESTION 67
What do you need to enable directory service authentication for iLO in HPE ProLiant Gen10 servers?
- A. HPE iLO 4 with iLO Advanced license
- B. HPE iLO 4 with iLO Advanced Premium Security Edition license
- C. HPE iLO 5 with Standard license
- D. HPE iLO 5 with iLO Advanced license
Answer: D
NEW QUESTION 68
You need to consolidate multiple BOMs, power requirements, and changing criteria of a Converged System due to the review of multiple reference architectures on Microsoft Exchange Server 2016. Which tool should you use?
- A. Single Point of Connectivity Knowledge (SPOCK)
- B. HPE Sizer for Microsoft Exchange Server 2016
- C. HPE Sizer for Server Virtualization
- D. HPE Converged Infrastructure Solution Sizer Suite
Answer: B
NEW QUESTION 69
A customer is learning about the performance enhancements of a new DL380 Gen10 system. How does this system help with performance problems?
- A. provides scalable persistent memory
- B. eliminates the need for Service Level Agreements for Cloud services and VDI
- C. provides compatibility with Intel Broadwell processors
- D. enables faster L4 cache on CPU
Answer: A
NEW QUESTION 70
What must a customer consider when adding an uplink set to a Logical Interconnect Group? (Choose two.)
- A. Logical Interconnects will automatically be restarted
- B. Logical Interconnects will need to be restarted
- C. Logical Interconnects will need to be updated from the group
- D. The associated Logical Interconnects will be flagged as inconsistent
- E. Additional Logical Interconnects will need to be created
Answer: B,C
NEW QUESTION 71
Match each Synergy component with the description of the functionality it provides.
Answer:
Explanation:
Explanation
Box 1: Frame Link Module
Box 2: Image Streamer
Box 3: Virtual Connect SE 40Gb F8
Box 4: Composer
NEW QUESTION 72
A customer is considering installing a Synergy frame in an existing rack where their c7000 chassis is currently installed.
Which question should you ask to ensure the new frame will be supported in the rack?
- A. Is there a UPS installed in the rack?
- B. Are there any third party servers installed?
- C. How deep is the existing rack?
- D. How wide is the existing rack?
Answer: A
NEW QUESTION 73
A customer is using a DL380 Gen10. They attempt to boot an installation media ISO with iLO Virtual Media, and the system fails to access the ISO. What are the most likely causes of this issue? (Select two.)
- A. UEFI is not configured for iSCSI initiator support
- B. Secure Boot has derived access to the ISO
- C. The ISO operating system is not supported by HPE
- D. Legacy Boot is not enabled and the media is not UEFI compatible
- E. HPSSA drives are configured for RAID 1 and not RAID 5
Answer: B,C
NEW QUESTION 74
You are configuring a new server for a customer. The customer has given you the following information regarding their environment:
* 2 processors with 22 cores
* 256GB RAM
* 600GB of usable internal storage
* 10GB network, dual connections
* iLO Advanced
* 3 years of 7x24 basic support
Which additional information do not need to determine the best option for internal storage?
- A. Is the application workload sensitive to I/O latency?
- B. Will a Fibre Channel card be required?
- C. Does the application require RoCE capable adapters?
- D. Does the application require a large memory footprint
Answer: A
NEW QUESTION 75
A customer experiences high response times to their Windows 2016 SQL database that exists on a ProLiant ML 350 Gen10 server. The customer needs to archive the lowest possible disk I/O response times.
Which HPE solutions should you recommend?
- A. Migrate to Enterprise SSD disk drives
- B. Migrate the database to a virtual machine
- C. Install Persistent Memory modules
- D. Install a HPE PCLe Workload Accelerator
Answer: A
NEW QUESTION 76
A customer has a two frame Synergy setup with two Virtual Connect SE 40Gb F8 modules and two 20Gb Interconnect Link Module interconnect modules. The customer needs to expand into a third frame.
Which interconnect modules should be used to extend the logical enclosure?
- A. 4 x Virtual Connect SE 40Gb F8 Interconnect Link Modules
- B. 2 x Virtual Connect SE 40Gb F8 Interconnect Link Modules
- C. 2 x 20Gb Interconnect Link Modules
- D. 1 x Virtual Connect SE 40Gb F8 Interconnect Link Modules and 1 x 20Gb Interconnect Link Modules
Answer: C
NEW QUESTION 77
Refer to the exhibit.
You are installing three Synergy frames for a customer PoC in the configuration shown. The composer is unable to discover the frames.
What is the most likely cause of the problem?
- A. The management ring should be connected using the FLM link ports
- B. The management network should be connected to the top and bottom frames
- C. Composer 2 is in the wrong frame
- D. Another composer is needed Frame 3
Answer: D
NEW QUESTION 78
A customer needs to install Red Hat 7.2 on a few DL380 Gen10 systems.
Which tool should be used for this deployment?
- A. Intelligent Provisioning
- B. OneView
- C. Insight Control server provisioning (ICsp)
- D. Image Streamer
Answer: A
NEW QUESTION 79
A customer plans to use RESTful API to deploy their rack of DL380 Gen10 system. How does use of this protocol support the customer? (Select two.)
- A. Boot via SFTP
- B. Secure remote scripting
- C. Ability to run scripts against multiple servers
- D. Boot via HTTP
- E. support multiple scripting languages
Answer: B,E
NEW QUESTION 80
A server consolidation solution must include services other than standard HPE CarePack deliverables. What should you include in your proposal to provide the customer with an overview of the project?
- A. scope of work
- B. work timeline
- C. terms and conditions
- D. billing schedule
Answer: A
NEW QUESTION 81
A health care customer is running out of space in their small on-site data center. They need a solution for their next generation infrastructure for their hospital and clinics.
proposed infrastructure needs the ability to run ESXi 6.5 with around 100 medium sized VMs customer has five remote clinics each clinic needs to be able to run approximately 10 VM's locally all of the VM's in the clinics need to be fully backed up every night What is the most appropriate solution to lead with?
- A. HPE Apollo AR4200
- B. HPE DL380 Gen10
- C. HPE Synergy populated with SY480 Gen10 Compute
- D. HPE SimpliVity 380 Gen10
Answer: D
NEW QUESTION 82
A customer needs a server that:
* supports their in-memory database
* is oriented towards business critical workloads
Which questions should you ask before you make a recommendation? (Choose two.)
- A. How important is it for the server to support ASHRAE A3/A4 standards?
- B. How will the datacenter provide backup power in the event of failure
- C. How many cores are required to optimize the application
- D. How much memory will the application require?
- E. How will the operating systems and application be deployed?
Answer: C,D
NEW QUESTION 83
......
HPE0-S54 Dumps and Practice Test (110 Exam Questions): https://www.verifieddumps.com/HPE0-S54-valid-exam-braindumps.html
