NEW QUESTION # 22
Which of the following is not a stage in the Process Discovery Framework?
- A. Process Definition
- B. Process Assessment
- C. Process Triage
- D. Process Analysis
Answer: A
Explanation:
Explanation
According to the result from [Process Discovery Framework - Blue Prism Community Site], Process Definition is not a stage in the Process Discovery Framework. The Process Discovery Framework is a structured approach to identify, assess, prioritize, and track processes that are suitable for automation. It consists of four stages: Process Triage, Process Assessment, Process Analysis, and Process Design. The other statements given are stages in the Process Discovery Framework. References: [Process Discovery Framework
- Blue Prism Community Site]
NEW QUESTION # 23
Which of the following statements most accurately describes the Programme Steering responsibility of the RPA Governance Board?
- A. Accountability for benefits realization tracking
- B. Providing an escalation point for critical delivery issues and risks
- C. Promote the benefits of RPA throughout the organization
- D. Defining opportunities through Process SME engagement
Answer: B
Explanation:
Explanation
According to the result from ROBOTIC OPERATING MODEL - SS&C Blue Prism, the Programme Steering responsibility of the RPA Governance Board is to provide an escalation point for critical delivery issues and risks. The RPA Governance Board is also responsible for ensuring alignment with business strategy, approving changes to the RPA roadmap, and overseeing benefits realization. Promoting the benefits of RPA, defining opportunities, or tracking benefits realization are part of other responsibilities such as Communication, Process Discovery, or Benefits Management. References: ROBOTIC OPERATING MODEL
- SS&C Blue Prism
NEW QUESTION # 24
Which of the following statements best describe the Database Server? (Choose all that apply.)
- A. It is used by Process Controllers to monitor Runtime Resources n production
- B. It acts as a centralized repository that holds process definitions and audit information
- C. All communications in either direction between the Interactive Clients or the Runtime Resources and the database are all channelled through the server
- D. It is typically deployed as a physical server in large-scale environments
Answer: A,B
Explanation:
Explanation
According to the result from Blue Prism Infrastructure Overview v6 - Blue Prism Portal, two statements that best describe the Database Server are that it is typically deployed as a physical server in large-scale environments, and that it acts as a centralized repository that holds process definitions and audit information.
The Database Server is a SQL Server database that stores all the information required by Blue Prism, such as process definitions, work queues,audit logs, credentials, and configuration data. The other statements given do not describe the Database Server. References: Blue Prism Infrastructure Overview v6 - Blue Prism Portal
NEW QUESTION # 25
Which of the following is a critical role for any RPA team at any maturity level?
- A. Release Manager
- B. Test Analyst
- C. Developer
- D. Project Manager
Answer: C
Explanation:
Explanation
According to the result from [Roles and Responsibilities of Blue Prism Developer - ], a developer is a critical role for any RPA team at any maturity level. A developer is responsible for designing, developing, testing, and maintaining automated processes and objects using Blue Prism. A developer also follows the delivery methodology, standards, and best practices for RPA development. The other roles given are not critical for any RPA team, as they may vary depending on the organizational model, size, and maturity of the RPA capability.
References: [Roles and Responsibilities of Blue Prism Developer - ]
NEW QUESTION # 26
Which of the following is a potential issue caused by retaining large volumes of session log data?
Available Choices (select all choices that are correct)
- A. The access policy is breached
- B. Database performance is enhanced
- C. The security policy is breached
- D. Database performance is degraded
Answer: D
Explanation:
Explanation
According to the result from Session logs viewer - SS&C Blue Prism, a potential issue caused by retaining large volumes of session log data is that database performance is degraded. Session log data is stored in the SQL Server database that hosts all the information required by Blue Prism. The more rows you display on the log viewer, the longer it will take to retrieve each page from the database. Depending on the size of your log and the performance of your databaseserver, this could take some time. Therefore, it is recommended to purge old session logs periodically to avoid performance issues. The other statements given are not potential issues caused by retaining large volumes of session log data. References: Session logs viewer - SS&C Blue Prism
NEW QUESTION # 27
What does PDI Stand for?
- A. Process Definition Instrument
- B. Process Definition Instruction
- C. Process Design Instruction
- D. Procedural Design Instruction
Answer: C
Explanation:
Explanation
According to the result from [Process Delivery Methodology Document - Blue Prism Portal], PDI stands for Process Design Instruction. This is a document that provides the detailed design of the automated process, including the object model, the process flow, the exception handling, and the test cases. It also serves as a guide for the development and testing of the process. References: [Process Delivery Methodology Document - Blue Prism Portal]
NEW QUESTION # 28
Which of the following statements best describes the "Build" stage of the Delivery Methodology?
- A. The build stage will explain how the process will be automated
- B. The build stage will examine the process prior to a solution design and the start of the build stage
- C. The build stage will confirm the readiness of the automation to deploy into the production environment
- D. The build stage will be the development of the automated process
Answer: D
Explanation:
Explanation
According to the result from Blue Prism Delivery Methodology Process Definition Phase, the build stage is the development of the automated process. The build stage involves designing, developing, and testing the Blue Prism solution using the Process Definition Document as a blueprint. The other statements given describe other stages of the Delivery Methodology, such as Define, Design, or Test. References: Blue Prism Delivery Methodology Process Definition Phase
NEW QUESTION # 29
Which of the following are benefits of the divisional model? (Choose all that apply.)
- A. Business prioritizes against own plan and demands
- B. Ability to scale as and when required without the people overhead
- C. Agility to make decisions quickly on new complimentary technology
- D. Full control over all aspects of the RPA program
Answer: A,C,D
Explanation:
Explanation
According to the result from [Roles and Responsibilities of Blue Prism Developer - ], some of the benefits of the divisional model are full control over all aspects of the RPA program, business prioritizes against own plan and demands, and agility to make decisions quickly on new complimentary technology. The divisional model is a decentralized RPA capability where each business area has its own dedicated RPA team that follows a common set of standards and best practices. This model allows business areas to have autonomy, flexibility, and alignment with their own objectives and needs. The other statement given is not a benefit of the divisional model, but rather a benefit of the outsourced managed service model. References: [Roles and Responsibilities of Blue Prism Developer - ]
NEW QUESTION # 30
In which phase of the Enterprise RPA Maturity Model should organizations start evangelizing about the benefits of digital workers?
- A. Institutionalize
- B. Industrialize
- C. None of the above
- D. Initialize
Answer: D
Explanation:
Explanation
According to the result from [Enterprise RPA Maturity Model - Blue Prism Community Site], organizations should start evangelizing about the benefits of digital workers in the Initialize phase of the Enterprise RPA Maturity Model. The Initialize phase is the first phase of the model, where organizations set up the foundations for RPA success, such as vision, strategy, governance, and organization. Evangelizing about the benefits of digital workers is part of the communication and stakeholder management activities that help drive cultural adoption and awareness of RPA across the organization. The other statements given are not correct, as evangelizing about the benefits of digital workers should not be delayed until later phases. References:
[Enterprise RPA Maturity Model - Blue Prism Community Site]
NEW QUESTION # 31
"This model provides organizations with a fast route to deployment as experienced partners provide an end-to-end RPA service". Which organizational model does this refer to?
- A. Franchise
- B. Outsourced Managed Service
- C. Divisional
- D. ICenter of Excellence
Answer: B
Explanation:
Explanation
According to the result from [Roles and Responsibilities of Blue Prism Developer - ], Outsourced Managed Service is the organizational model that provides organizations with a fast route to deployment as experienced partners provide an end-to-end RPA service. Outsourced Managed Service is a model where an external partner takes full responsibility for delivering and managing RPA solutions for an organization. The other models given do not refer to an external partner providing an end-to-end RPA service. References: [Roles and Responsibilities of Blue Prism Developer - ]
NEW QUESTION # 32
Which of the following describes why Business Representatives need to be represented in the RPA Governance Board?
- A. Business areas are accountable for RPA delivery
- B. Business areas are not responsible for managing alignment with business strategy
- C. Business areas are consumers of services provided by the RPA capability
- D. To ensure functional areas within the organization can demand their automation projects are first in line over anybody else
Answer: C
Explanation:
Explanation
According to the result from ROBOTIC OPERATING MODEL - SS&C Blue Prism, Business Representatives need to be represented in the RPA Governance Board because they are consumers of services provided by the RPA capability. They also provide input on business priorities, benefits realization, risk management, and stakeholder engagement. Business areas are not responsible for demanding their automation projects, managing alignment with business strategy, or being accountable for RPA delivery.
References: ROBOTIC OPERATING MODEL - SS&C Blue Prism
NEW QUESTION # 33
Which of the following best describes a Runtime Resource?
- A. A physical or virtual machine with Blue Prism installed that runs automated processes against target applications, often referred to as the Digital Worker
- B. This marshals all connectivity between the Blue Prism components and the database
- C. A physical or virtual machine with Blue Prism installed which facilitates the development configuration and monitoring of Blue Prism processes
- D. This is a SQL server which hosts the database
Answer: A
Explanation:
Explanation
According to the result from Blue Prism Infrastructure Overview v6 - Blue Prism Portal, a Runtime Resource is a physical or virtual machine with Blue Prism installed that runs automated processes against target applications, often referred to as the Digital Worker. A Runtime Resource is typically provisioned as a data-center secured digital device with no requirement for target applications to be installed. It acts as a centralized repository that holds process definitions and audit information. The other statements given do not describe a Runtime Resource. References: Blue Prism Infrastructure Overview v6 - Blue Prism Portal
NEW QUESTION # 34
Which of the following are key access considerations when onboarding Digital Workers? They will require:
(Choose all that apply.)
- A. Administrator rights to the in-scope applications
- B. Access to in-scope folders and shared drives needed for the process being automated
- C. Access to n-scope applications needed for the process being automated
- D. Permissions to every area in the in-scope applications
Answer: B,C
Explanation:
Explanation
According to the result from [Blue Prism Infrastructure Overview v6 - Blue Prism Portal], two key access considerations when onboarding Digital Workers are that they will require access to in-scope applications needed for the process being automated, and access to in-scope folders and shared drives needed for the process being automated. These access considerations are necessary to ensure that the Digital Workers can perform their tasks without any interruptions or errors. The other statements given are not key access considerations, as they are either too broad or too restrictive. References: [Blue Prism Infrastructure Overview v6 - Blue Prism Portal]
NEW QUESTION # 35
What is the primary objective of the Developer?
- A. To lead opportunity assessments, create the process definitions and support the testing as required
- B. To manage the implementation of a certified Blue Prism capability
- C. To manage the RPA team through delivery of new processes and support of existing processes
- D. To design, develop and support Blue Prism solutions
Answer: D
Explanation:
Explanation
According to the result from Blue Prism University | ROM Architect Certification, the primary objective of the Developer is to design, develop and support Blue Prism solutions. The Developer is also responsible for following best practices and standards, ensuring quality and compliance, and collaborating with other roles such as Analysts or Testers. Leading opportunity assessments, creating process definitions, managing RPA implementation, or managing RPA team are not part of the Developer's objective. References: Blue Prism University | ROM Architect Certification
NEW QUESTION # 36
Which of the following statements most accurately describe the "Vision" for creating an RPA capability?
(Choose all that apply.)
- A. Agreeing the delivery approach based on the Blue Prism vanilla methodology and embedding the templates and policies into existing client change management methodologies
- B. Defining how RPA will deliver aligned business objectives
- C. Identifying the expected business benefits and outline how these align to corporate strategy
- D. Defining the opportunity assessment approach and pipeline triage procedure
Answer: B,C
Explanation:
Explanation
According to the result from Robotic Operating Model (ROM) | SS&C Blue Prism, two statements that most accurately describe the "Vision" for creating an RPA capability are defining how RPA will deliver aligned business objectives, and identifying the expected business benefits and outline how these align to corporate strategy. The Vision should be a clear and compellingstatement that describes how RPA will support the organization's strategic goals and objectives, and what benefits it will bring to the stakeholders. The other statements given describe other foundations such as Governance & Pipeline or Delivery Methodology.
References: Robotic Operating Model (ROM) | SS&C Blue Prism
NEW QUESTION # 37
Which of the following are responsibilities of the Head of RPA? (Choose all that apply.)
- A. The Head of RPA is responsible for handling technical issues that occur during RPAimplementation
- B. The Head of RPA fixes the system when the server goes down
- C. The Head of RPA is responsible for delivering the vision for RPA in addition to taking ownership of the Digital Workforce itself
- D. The Head of RPA owns the vision for RPA
Answer: C,D
Explanation:
Explanation
According to the result from ROBOTIC OPERATING MODEL - SS&C Blue Prism, the Head of RPA is responsible for creating and delivering the vision for RPA in addition to taking ownership of the digital workforce itself. The Head of RPA is also accountable for ensuring alignment with business strategy, stakeholder management, benefits realization, and governance. Handling technical issues or fixing the system when the server goes down are not part of the Head of RPA's responsibilities. References: ROBOTIC OPERATING MODEL - SS&C Blue Prism
NEW QUESTION # 38
Which of the following statements is a possible challenge of the Center of Excellence Model?
- A. Can create a bottleneck if the pipeline becomes too big
- B. Standards can become fragmented and difficult to impose
- C. Blue Prism infrastructure hardware may be duplicated
- D. Difficult to deploy a consistent delivery and service model
Answer: A
Explanation:
Explanation
According to the result from Roles and Responsibilities of Blue Prism Developer -, a possible challenge of the Center of Excellence model is that it can create a bottleneck if the pipeline becomes too big. The Center of Excellence model is a centralized RPA capability that serves multiple business areas. However, this can also lead to high demand and limited resources, resulting in delays and inefficiencies. The other statements given are not challenges of the Center of Excellence model. References: Roles and Responsibilities of Blue Prism Developer -
NEW QUESTION # 39
Which of the following statements best describe Process Inventory Management? (Choose all that apply.)
- A. The approach of discovering processes for automation
- B. Putting in place the infrastructure that enables effective management of opportunities for automation
- C. Establishing a process mining approach
- D. The platform from which reporting can be done, to ensure that the value of automation programmersis communicated
Answer: B,D
Explanation:
Explanation
According to the result from ROBOTIC OPERATING MODEL - SS&C Blue Prism, Process Inventory Management is about putting in place the infrastructure that enables effective management of opportunities for automation. It also provides the platform from which reporting can be done, to ensure that the value of automation programs is communicated. The approach of discovering processes for automation or establishing a process mining approach are part of other aspects such as Process Discovery or Process Mining.
References: ROBOTIC OPERATING MODEL - SS&C Blue Prism
NEW QUESTION # 40
Select the correct statement that describes the Robotic Operating Model?
- A. Provides an unstructured and uncontrolled environment within which the deliverables are developed and tested by resources working under the Operations team structure
- B. Provides structure and controls, within which the deliverables are developed and tested bv resources working under the RPA Centre of Excellence
- C. Provides a structured and controlled environment within which the deliverables are developed and tested by IT resources working under the IT team structure
- D. Provides an unstructured and uncontrolled environment within which the deliverables are developed and tested by resources working under the IT team structure
Answer: B
Explanation:
Explanation
According to the result from ROBOTIC OPERATING MODEL - SS&C Blue Prism, the Robotic Operating Model is Blue Prism's industry leading approach to successfully providing maximum business benefit through the scaled deployment of Robotic Process Automation that rapidly delivers on-going business value through the identification and automation of manual processes within a structured and controlled, IT approved environment. It provides the foundations for evolving the traditional Target Operating Model to embrace the digital workers and establish a seamless bi-directional flow of work between the human and the digital workforce. References: ROBOTIC OPERATING MODEL - SS&C Blue Prism
NEW QUESTION # 41
Which role is responsible for implementation of processes into Production?
- A. Process Controller
- B. Lead Developer
- C. Business Process Owner
- D. Release Manager
- E. Head of RPA
Answer: D
Explanation:
Explanation
According to the result from Blue Prism University | Release Manager, the Release Manager is responsible for implementation of processes into Production. The Release Manager handles the release administration of the SS&C Blue Prism live environment and determines the processes that are ready for the next stage. The Release Manager is also responsible for moving assets between development, test and production. The other roles given are not directly involved in implementing processes into Production. References: Blue Prism University | Release Manager
NEW QUESTION # 42
Which of the following statements most accurately describes the ROM?
- A. The ROM provides a mechanism for ensuring a model is in place for the digital workers to eventually replace the human workforce
- B. The ROM provides the foundations for evolving the traditional Target Operating Model to embrace a digital workforce and establish a seamless bi-directional flow of work between the human and the digital workforce
- C. The ROM allows the organization to understand that the digital workforce will ultimately replace the human workforce and facilitates the start of the replacement process
- D. The ROM enables IT to encompass RPA into the IT toolset to ensure all RPA projects are delivered bv IT
Answer: B
Explanation:
Explanation
According to the result from [Robotic Operating Model (ROM) | SS&C Blue Prism], the statement that most accurately describes the ROM is that it provides the foundations for evolving the traditional Target Operating Model to embrace a digital workforce and establish a seamless bi-directional flow of work between the human and the digital workforce. The ROM is an intelligent automation implementation methodology that empowers organizations to successfully launch, maintain and scale their digital workforce. It provides guidance on how to set up and manage an RPA capability that aligns with business strategy, governance, and best practices. The other statements given are not accurate descriptions of the ROM. References: [Robotic Operating Model (ROM) | SS&C Blue Prism]
NEW QUESTION # 43
Which of the following organizational models deploy delivery capabilities in multiple business areas? (Choose all that apply.)
- A. Center of Excellence
- B. Divisional
- C. Franchise
- D. Outsourced Managed Service
Answer: B,C
Explanation:
Explanation
According to the result from Roles and Responsibilities of Blue Prism Developer -, two possible organizational models that deploy delivery capabilities in multiple business areas are Divisional and Franchise.
In a Divisional model, each business area has its own dedicated RPA team that follows a common set of standards and best practices. In a Franchise model, each business area has its own RPA capability that operates independently from other areas. The other models given do not deploy delivery capabilities in multiple business areas. References: Roles and Responsibilities of Blue Prism Developer -
NEW QUESTION # 44
Which of the following is a responsibility of the Test Analyst?
- A. Responsible for oversight of the technology platform; interacting with IT as required
- B. Identifying and breaking down all necessary tasks to test an automated process
- C. Ultimate escalation points for Digital Workforce-related operational or performance issues
- D. Responsible for managing and reporting on RPA benefit realization to leadership
Answer: B
Explanation:
Explanation
ccording to the result from Blue Prism University | ROM Architect Certification, identifying and breaking down all necessary tasks to test an automated process is a responsibility of the Test Analyst. The Test Analyst is responsible for ensuring that automated processes meet quality standards and requirements, as well as performing testing activities such as development testing, user acceptance testing, regression testing, and environment testing. The other statements given are not responsibilities of the Test Analyst, but rather responsibilities of other roles such as Process Controller, Technical Architect, or Head of RPA.
References: Blue Prism University | ROM Architect Certification
NEW QUESTION # 45
Which of the following is an outcome of the Blue Prism Delivery Methodology?
- A. Reducing test phases by introducing production data later than traditional SDLCs
- B. Providing best practice that reduces the potential for automation and accelerates development
- C. Creating re-usable resilient and scalable assets that reduce delivery effort and long term service costs
- D. Mitigating risk by providing late visibility of potential issues
Answer: C
Explanation:
Explanation
According to the result from Process Delivery Methodology Document - Blue Prism Portal, an outcome of the Blue Prism Delivery Methodology is creating re-usable resilient and scalable assets that reduce delivery effort and long term service costs. The Delivery Methodology provides a structured and controlled approach to developing Blue Prism processes using best practices and standards. The other statements given are not outcomes of the Delivery Methodology. References: Process Delivery Methodology Document - Blue Prism Portal
NEW QUESTION # 46
......
ARA02 Free Certification Exam Material with 62 Q&As : https://www.verifieddumps.com/ARA02-valid-exam-braindumps.html
UPDATED ARA02 Exam Questions Certification Test Engine to PDF: https://drive.google.com/open?id=1t4gK1RqyOXQx7uFJqnzRGumm-DavA3zF