NEW QUESTION # 29
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

  • A. Transportation lead times
  • B. Minimum lot size
  • C. Aggregated constraints
  • D. Maximum lot size
  • E. Adjusted transport receipts

Answer: A,B,E


NEW QUESTION # 30
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are
2 correct answers to this question.

  • A. Multi-Level Supply Planning Heuristics
  • B. Scenario analysis for operational supply planning
  • C. Time series analysis
  • D. Simple statistical forecast

Answer: A,D


NEW QUESTION # 31
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?

  • A. Capacity expansion with additional costs
  • B. Production source validity at the start of seasonal peak
  • C. Incremental production values
  • D. Adjusted production interactive values

Answer: A


NEW QUESTION # 32
What are the S&OP operator (optimizer) parameters associated with demand fair share?

  • A. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
  • B. Number of fair share segments Additional tiering costs (default) Inventory days of supply
  • C. Number of fair share segments Additional tiering costs (default) Maximum inventory
  • D. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery

Answer: D


NEW QUESTION # 33
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are
3 correct answers to this question.

  • A. Increase the use of incremental lot size beyond the frozen horizon.
  • B. Keep the number of fairshare segments small.
  • C. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
  • D. Avoid using telescopic time buckets.
  • E. Split into multiple planning areas to support weekly vs. daily planning needs.

Answer: C,D,E


NEW QUESTION # 34
Forecast Error CV is an input to which of the following?

  • A. Calculate Target Inventory Components in Inventory Planning Profile Operator
  • B. Multistage Inventory Optimization in Inventory Planning Profile Operator
  • C. Time-Series-Based Supply Planning Optimizer
  • D. Forecast Error Calculation in Inventory Planning Profile Operator

Answer: B


NEW QUESTION # 35
For which of the following application jobs can you enter planning filters as parameters?Note: There are
2 correct answers to this question.

  • A. Purge Non-Conforming Data
  • B. Create Time Periods for Time Profiles
  • C. Purge Key Figure Data
  • D. Purge Master Data

Answer: C,D


NEW QUESTION # 36
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.

  • A. Use Excel Cell References in the Report Editor option is selected.
  • B. Users should have authorization for template administration.
  • C. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.
  • D. Activate Local Member Recognition setting is selected.

Answer: B,D


NEW QUESTION # 37
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note:
There are 2 correct answers to this question.

  • A. Copying multiple key figures on different planning levels is not possible.
  • B. Copying multiple key figures can be processed sequentially.
  • C. If necessary source key figures values are disaggregated.
  • D. If necessary target key figures values are disaggregated.

Answer: B,D


NEW QUESTION # 38
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to this question.

  • A. Supply Heuristics in SAP IBP for sales and operations
  • B. Charts creation in SAP Supply Chain Control Tower
  • C. Demand Sensing with Gradient Boosting (Full)
  • D. Decoupling Points determination in SAP IBP for demand-driven replenishment

Answer: A,C


NEW QUESTION # 39
Which pre-processing steps can be used to cleanse historical sales data before generating a statistical forecast in SAP IBP?Note: There are 2 correct answers to this question.

  • A. Promotion Sales Lift Elimination
  • B. Substitute Missing with Mean or Median in Sales History
  • C. Intermittency Detection and Correction in Sales History
  • D. Bias Detection and Correction in Sales History

Answer: A,B


NEW QUESTION # 40
Which SAP IBP planning operator can be run to delete planning objects in a certain version?

  • A. Purge Master Data
  • B. Purge Key Figure Data
  • C. Purge Key Figure Data Outside Planning Area Planning Horizon
  • D. Purge Non-Confirming Data

Answer: B


NEW QUESTION # 41
What does ABC/XYZ segmentation allow you to do?Note: There are 2 correct answers to this question.

  • A. Substitute missing values in case of sporadic demands.
  • B. Choose time-independent key figures as segmentation measures.
  • C. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B".
  • D. Identify inventory items that require closer attention.

Answer: B,D


NEW QUESTION # 42
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Specify a planning horizon in the planning area for each level of the assigned time profile.
  • B. Configure at most two input key figures on the same planning level in a key figure calculation.
  • C. Assign the compound master data type and its component master data types.
  • D. Configure at least one calculated key figure for the planning area.

Answer: A,C


NEW QUESTION # 43
The S&OP Operator Profiles app is used to configure different types of algorithms.Which algorithm- specific settings are unique for only the Time Series-based Supply Optimizer?Note: There are 2 correct answers to this question.

  • A. Discretization
  • B. Processing mode
  • C. Global cost factors
  • D. Time profile level

Answer: B,C


NEW QUESTION # 44
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Change the description of the attributes in the time profile.
  • B. Add a new time profile level to the time profile.
  • C. Change the past and future horizon of the levels in the time profile.
  • D. Change the numbering hierarchy of the period IDs in the time profile.

Answer: A,C


NEW QUESTION # 45
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.

  • A. Leveraging the web-based planning capability
  • B. Leveraging the functionality of SAP Workzone
  • C. Using Microsoft Excel planning views
  • D. Using Driver-Based planning

Answer: A,C


NEW QUESTION # 46
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.

  • A. Lag-based snapshots are created in the Configuration app for a fixed time range.
  • B. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
  • C. Target key figures for these snapshots are exposed to the user in planning views.
  • D. The number of lag-based snapshots are limited to nine levels.

Answer: A,B


NEW QUESTION # 47
What are some of the properties of filter blocks?Note: There are 3 correct answers to this question.

  • A. Filter blocks can be visualized in the Key Figure Calculations app.
  • B. Filter blocks are imposed when modeling an attribute as a key figure.
  • C. Filter blocks are imposed when modeling attribute transformations.
  • D. Filter blocks are imposed when modeling cross-period calculations.
  • E. Filter blocks can be visualized in SAP IBP, add-in for Microsoft Excel

Answer: B,C,E


NEW QUESTION # 48
What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned?

  • A. Created as type NVARCHAR and assigned to an external master data type
  • B. Created as type INTEGER and assigned to a simple master data type
  • C. Created as type INTEGER and assigned to a compound master data type
  • D. Created as type DECIMAL and assigned to a compound master data type

Answer: D


NEW QUESTION # 49
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.

  • A. Simulation Chart Types
  • B. Trend Chart Types
  • C. Geographic Chart Types
  • D. Seasonal Chart Types
  • E. Comparison Chart Types

Answer: B,D,E


NEW QUESTION # 50
You create a planning filter using an SAP IBP Fiori app.Which of the following objects can it be applied to?Note: There are 2 correct answers to this question.

  • A. Supply chain graph in Supply Chain Network app
  • B. Planning view templates in the SAP IBP add-in for Microsoft Excel
  • C. Snapshot operator in the SAP IBP add-in for Microsoft Excel
  • D. Jobs in the Applications Jobs app

Answer: B,D


NEW QUESTION # 51
You are reviewing the master data types that are often used for supply and inventory planning
.Which master data types are compound master data types?Note: There are 2 correct answers to this question.

  • A. SOURCEPRODUCTION
  • B. SOURCECUSTGROUP
  • C. SOURCELOCATION
  • D. SOURCECUSTOMER

Answer: C,D


NEW QUESTION # 52
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note:
There are 3 correct answers to this question.

  • A. You can only apply one value-based filter per planning view.
  • B. The alerts dashboard is not available if a value-based filter is set for the open planning view.
  • C. These filters can be used together with attribute totals in the same planning view.
  • D. You can add (or delete) planning objects to a planning view after these filters are applied.
  • E. These filters are always applied based on the values stored in the database.

Answer: A,B,E


NEW QUESTION # 53
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?

  • A. IF("PERIODID3" ="$$PERIODID3CU$$...)
  • B. IF("PERIODID2" ="$$PERIODID2CU$$...)
  • C. IF("PERIODID4" ="$$PERIODID4CU$$...)
  • D. IF("PERIODID5" ="$$PERIODID5CU$$...)

Answer: A


NEW QUESTION # 54
......