
New 2022 Latest Questions C_TS422_2021 Dumps - Use Updated SAP Exam
Latest C_TS422_2021 Exam Dumps SAP Exam from Training Expert VerifiedDumps
SAP C_TS422_2021 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
C_TS422_2021 Exam Certification Details:
| Duration: | 180 mins |
| Exam: | 80 questions |
| Languages: | German, English, Japanese, Chinese |
| Cut Score: | 54% |
| Sample Questions: | SAP C_TS422_2021 Exam Sample Question |
NEW QUESTION 49
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
- A. MRP planning file
- B. MRP type
- C. MRP controller
- D. MRP group
Answer: C
NEW QUESTION 50
You want to use capacity availability checks for production orders. Which settings have to be made for this?
- A. A checking rule must be assigned in the checking control
- B. The PRT Availability Check must be set in the checking control.
- C. An overall profile must be assigned in the checking control.
- D. The Relevant for Finite Scheduling indicator must be set
Answer: C,D
NEW QUESTION 51
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?
- A. When you create a sales order
- B. When you create a planned order
- C. When you deliver a sales order
- D. When the MRP result are saved
Answer: A
NEW QUESTION 52
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When multiple planned orders exist on one resource
- B. When multiple production versions are maintained for one product
- C. When alternate resources are used within one operation
- D. When multiple operations are maintained for one product
Answer: C
NEW QUESTION 53
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
- A. Direction
- B. Planning mode
- C. Finiteness level
- D. Fixed pegging
- E. Scheduling control
Answer: A,B,E
NEW QUESTION 54
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?
- A. Change the explosion type of the phantom assembly in the BOM.
- B. Change the phantom item indicator for the phantom assembly in the BOM.
- C. Change the special procurement key of the phantom assembly in the BOM.
- D. Change the item category of the phantom assembly in the BOM.
Answer: A
NEW QUESTION 55
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?
- A. Schedule in working time only
- B. Find slot
- C. Squeeze in
- D. Insert operation
Answer: B
NEW QUESTION 56
How can you set up the supply source for the Kanban process in SAP S/4HANA?
- A. Using stock transfer reservations for stock transfer
- B. Using purchase orders for external procurement
- C. Using run schedule quantities for in-house production
- D. Using purchasing costs for automated source prioritization
- E. Using quotations for internal and external procurement
Answer: A,B,C
NEW QUESTION 57
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
- A. Purchase requistion
- B. Production order
- C. Scheduling agreement schedule line
- D. Stock transport order
- E. Planned order
Answer: A,C,E
NEW QUESTION 58
Which of the following is valid sequence of the main activities in production order processing?
- A. Creation, release, settlement, goods issue, confirmation, goods receipt
- B. Creation, release, printing, goods issue, confirmation, goods receipt
- C. Creation, printing, release, goods issue, confirmation, goods receipt
- D. Creation, availability check, release, material widrawal, confirmation
Answer: B,D
NEW QUESTION 59
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?
- A. In Customizing you can decide by material type whether to use the long material number.
- B. The number of leading zeros for internal numbers is client-specific.
- C. The display template for material numbers applies to all clients.
- D. The maximum mater all number length is 40 for external numbers and 18 for internal numbers
Answer: C,D
NEW QUESTION 60
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?
- A. Model a resource inbound in the location master.
- B. Model a seperate resource in the production data structure.
- C. Model a transportation resorce in the location master.
- D. Model a handling resource in the location master and goods receipt time in the material master.
Answer: C,D
NEW QUESTION 61
What are some uses for the low-level code assigned to each material?
- A. It is used by engineering to indentify subitems in an engineering bill of material (BOM).
- B. it is used by ATP to determine the priority of alternative components.
- C. It is used by product costing to determine how coast are rolled up.
- D. It is used in MRP to determine the sequence in which materials are planned.
Answer: C,D
NEW QUESTION 62
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Make-to-order production (20)
- B. Planning with final assembly (40)
- C. Planning at assembly level (70)
- D. Planning without final assembly (50)
Answer: D
NEW QUESTION 63
For a production version to be valid and consistent what requirements must be fulfilled?
- A. The assigned routing must be a rate routing.
- B. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- C. The lot size range must be within the lot-size range of the assigned routing.
- D. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- E. The assigned routing must NOT have alternative sequences.
Answer: B,C,D
NEW QUESTION 64
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up to the reorder stock level
- B. Fill up based on the lot size procedure
- C. Fill up to the maximum stock level
- D. Fill up to the safety stoc level
Answer: B
NEW QUESTION 65
Which business processes are affected by setting in the order type-dependent parameters?
- A. Implement engineering changes.
- B. Select master data.
- C. Intiate quality inspections.
- D. Define integration to cost accounting.
Answer: B,D
NEW QUESTION 66
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
- A. By usage probability
- B. First in first out (FIFO)
- C. 100% check
- D. Simultaneous
Answer: A,C
NEW QUESTION 67
What type of time element can be reduced by strategy settings while dispatching?
- A. Queue time
- B. Transportation time
- C. Wait time
- D. Setup time
Answer: A,C
NEW QUESTION 68
How can SAP S/4HANA support a GMP-compliant production process?
- A. Approved resources
- B. Digital signature
- C. Recipe approval
- D. Batch record
- E. GMP-compliant flag
Answer: B,C,D
NEW QUESTION 69
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?
- A. Use the material staging report.
- B. Use the material where-used report.
- C. Use batch determination.
- D. Use the batch information cockpit.
Answer: D
NEW QUESTION 70
What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planed order is converted to production order.
- B. The planed order's component availability is checked.
- C. The planed order generates capacity requirements
- D. The planned order's components are copied to the picking list.
Answer: C
NEW QUESTION 71
Where do you maintain the work center that represents the production line for repetitive manufacturing?
- A. Production cost collector
- B. Routing
- C. Production version
- D. Repetitive manufacturing profile
Answer: B,C
NEW QUESTION 72
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?
- A. The work center has several invidula capacities.
- B. The Change Planning Direction indicator is set in strategy profile.
- C. Alternative work centers are fully occupied.
- D. The finite Scheduling indicator is NOT set in the strategy profile.
Answer: A,D
NEW QUESTION 73
......
Updated Test Engine to Practice C_TS422_2021 Dumps & Practice Exam: https://www.verifieddumps.com/C_TS422_2021-valid-exam-braindumps.html
Pass SAP C_TS422_2021 PDF Dumps Recently Updated 82 Questions: https://drive.google.com/open?id=1gElNK3OidhpkTaVfbZ38fwe6uZfa-aYk
